Current plans are to upgrade part of Kentucky 555 to a four lane highway as part of the Heartland Parkway project. See the Heartland Parkway page for more information.

KY 555 News Items

[KY 55]

KY 55/US 68/KY 555 Widening Recommended for Heartland Parkway

The Kentucky Transportation Cabinet has recommended that the proposed “Heartland Parkway” between Columbia and Springfield be constructed by widening KY 55, US 68, and KY 555 to four lanes along their existing route.

More information: Central Kentucky News-Journal: Heartland Parkway could be a little closer (March 6, 2005) [Outside Link]

[New Route]

Three Options Considered for “Heartland Parkway”

The Kentucky Transportation Cabinet recently presented three options for the so-called Heartland Parkway in central Kentucky between Columbia and Springfield.

  • Option 1 would construct a new interstate-like highway between the Cumberland Parkway and Blue Grass Parkway. The new highway would follow a corridor roughly two miles to the west of KY 55/US 68/KY 555.
  • Option 2 would widen the existing KY 55/US 68/KY 555 route to four lanes.
  • Option 3 would keep the current KY 55/US 68/KY 555 route at two lanes, but add passing lanes every three miles.

Area residents expressed a wide variety of opinions about the three options at the recent public meetings.

More information: Lebanon Enterprise: Opinions vary about Heartland Parkway options (August 19, 2004) [Outside Link]

[KY 55]

Heartland Parkway on Track

Posted: 24-Jun-2004 1:29AM CDT

Team Taylor County executive director Kevin Sheilley recently reported at a meeting of the Campbellsville/Taylor County Industrial Development Authority that he believes planning for the Heartland Parkway is still on track: (Campbellsville) Central Kentucky News Journal: FOL building may be demolished (June 6, 2004) [Outside Link]

The U.S. House of Representatives recently passed a transportation project authorization bill containing a number of Kentucky projects. Including:

The Louisville-Southern Indiana Bridges Project

  • $7 million for continuing the Brent Spence Bridge replacement study
  • I-65 connector route in Warren County
  • Pennyrile Parkway extension in Christian County
  • The Heartland Parkway
  • I-66 northern bypass of Somerset

The Senate has passed a similar bill. Differences between the two bills must now be reconciled and passed by both houses before going before the president for his approval or veto.

More information: Courier-Journal: Bill with bridges money held up (Apr. 1, 2004) [Outside Link] , Business First of Louisville: House passes bill with funding for bridges project (Mar. 29, 2004) [Outside Link], Cincinnati Post: $7M for bridge a drop in bucket (Apr. 3, 2004) [Outside Link], Kentucky New Era: $8 million approved for parkway extension (Apr. 3, 2004) [Outside Link], Central Kentucky News-Journal: Parkway is closer to reality (Apr. 4, 2004) [Outside Link]

The Cincinnati Enquirer reports that greater Cincinnati area projects are fairing poorly in the bill: Cincinnati Enquirer: Local roads kicked to the curb (Apr. 2, 2004) [Outside Link]

[New Route]

Options Unveiled for Heartland Parkway

Posted: 18-Mar-2004 8:43AM CST

Transportation officials have revealed three options for a proposed route between Columbia and Springfield. The proposed route has been called the Heartland Parkway and would pass through Adair, Taylor, Marion and Washington Counties.

One option would see the construction of the an interstate-type highway between the Louie B. Nunn Cumberland Parkway and the Blue Grass Parkway.

A second option would widen a route along KY 55, US 68, and KY 555 to four lanes.

A third option would simply add one mile of passing lanes to every three miles of road along KY 55, US 68, and KY 555 between the two parkways.

Current highway plans include no funding for the project other than this initial study.

More information: Central Kentucky News-Journal: Heartland Parkway -- Three options unveiled for 60-mile road (March 14, 2004) [Outside Link]

[KY 55]

Heartland Parkway

Posted: 1-Oct-2003 1:48AM CDT

Materials from recent public meeting concerning the proposed Heartland Parkway have been posted on the transportation cabinet's web site. The proposed corridor will follow KY 55 and KY 555 from the Louie B. Nunn Cumberland Parkway to the Martha Layne Collins Blue Grass Parkway.

More information: KYTC Division of Planning: Heartland Parkway [Outside Link]

[KY 55]

Upcoming Heartland Parkway Public Meetings

Posted: 30-Aug-2003 7:48PM CDT

The Kentucky Transportation Cabinet will hold a series of public meetings to discuss the construction of a new four lane divided highway between Springfield and Columbia along the KY 55/KY 555 corridor.

  • Sept. 2 - Lebanon
  • Sept. 4 - Columbia
  • Sept. 8 - Springfield
  • Sept. 11 - Campbellsville

More information: Lebanon Enterprise: Public meeting is scheduled for Heartland Parkway discussion (Aug. 27, 2003) [Outside Link]

Updated: 1-Mar-2006 2:40AM CST