[US 41]

Henderson US 41 Repairs to Begin

Posted: 31-Jul-2002 1:46AM CDT

2.8 miles of US 41 between the US 60 interchange and the Ohio River will be repaved through the month of July. 1.5 inches of the road's concrete surface will be removed and replaced with asphalt. Permanent traffic counting equipment will also be installed. A 1996 study showed 37,000 vehicles per day use US 41 just north of the Audubon State Park.

More information: MyInKy.com: Busy U.S. 41-North in Henderson to be repaired, repaved in July (June 28, 2002) [Outside Link]

Comments

Updated: 31-Jul-2002 1:46AM CDT