Kentucky State Route 1747 is known as the Hurstbourne Parkway. The road travels from KY 22 to US 31E/US 150 in eastern Jefferson County.
KY 1747 News Items
Courier-Journal Reviews Louisville-Jefferson County Road Work
The Courier-Journal reports on a number current and upcoming road projects in their August 23 edition. Among these projects are:
- I-264 - A two-year project to reconstruct the western leg of I-264 between I-64 and Dixie Highway. This section of I-264 is known as the Shawnee Expressway. The 7.6-mile $60 million project will include adding two lanes near I-64. Work will begin in the spring.
- Hurstbourne Parkway (KY 1747) - A project begin in July to extend Hurstbourne Parkway from Bardstown Road to Fern Valley Road.
- Westport Road (KY 1447) - Westport Road will be widened to 5 lanes from Hubbards Lane to Hurstbourne Parkway. A new interchange will be constructed at I-264.
- National Turnpike (KY 1020) - Widen to five lanes from Southside Drive to Outer Loop.
- New Cut Road (KY 1865) - Widen to five lanes from Third Street Road to Outer Loop.
- Jefferson Boulevard - Construct a four lane extension from McCawley Road north to Poplar Level Road.
- Gene Snyder Freeway (KY 841/I-265) - Resurface three miles near Bardstown Road.
More information: Courier-Journal: ROAD WORK AHEAD: Watch for headaches (Aug. 23, 2002) ![]()
I-64 and Hurstbourne Parkway Interchange to be Reconstructed
A project to reconstruct the interchange of Hurstbourne Parkway and I-64 in eastern Jefferson County is planned to begin in 2006. The interchange is currently one of the most congested and accident prone interchanges in Jefferson County. The reconstructed interchange will eliminate left turns across Hurstbourne Parkway and add ramps to Linn Station Road. The project has been dubbed "The Big Fix."
More information: Courier-Journal: 'Big fix' planned at Hurstbourne interchange (July 5, 2002) ![]()
Procurement Bulletins
The Kentucky Transportation Cabinet Division of Professional Services has posted several procurement bulletins
. Even if you aren't a contractor, these bulletins are useful for learning about upcoming road projects. Recent bulletins include:
- preliminary design of a new interchange near mile 27 on the Daniel Boone Parkway
, - widening of Hurstbourne Parkway (KY 1747) near I-64 and US 60 in Jefferson County
, - reconstruct KY 1848 near I-64 in Shelby County
, - preliminary engineering for reconstructing part of KY 194 in Pike County
, - design for US 641 relocation in Crittenden and Lyon county
, - design for US 60 widening in Ballard and McCracken county
, - scoping study for the proposed Heartland Parkway
, - bridge replacement on KY 22 in Pendleton county
, - design for KY 1/KY 7 widening project in Carter county
, - design of a new connector between KY 6 and the Corbin by-pass in Knox and Whitley counties
, - and preliminary engineering of a railroad grade separation on KY 80 in Pike County
.
Hurstbourne Parkway Extension Construction to Begin in May
The Courier-Journal reports in this article
that a 3.3 extension to Hurstbourne Parkway will begin in May. The road will be extended from Bardstown Road to Fern Valley Road in Jefferson County. A gas pipeline has to be moved to allow for construction.