This page contains news and information about Kentucky State Road KY 884.

KY 884 News Items

[US 31W]

Widening Continues on the U.S. 31-W Bypass, KY 884 and U.S. 79 in District 3

Three road widening projects are under way in Kentucky Transportation Cabinet District 3, according to its traffic impact report for Oct. 18–23:

  • US 31 (U.S. 31-W Bypass), Bowling Green: widening to five lanes from KY 234 to Park Street in northern Bowling Green, expected to be completed in 2027. Through the construction zone, traffic is narrowed to one lane in each direction with a center turn lane.
  • KY 884, Bowling Green: widening to three lanes from McCoy Place to Fieldstone Boulevard has started, with a roundabout at Smallhouse Road, sidewalks on both sides and a new bridge over I-165.
  • US 79, Todd County: widening from the Tennessee state line to mile marker 3.

A safety project on U.S. 31-E in Barren County also includes minor widening, to create a 4-foot buffer between opposing lanes.

The full report from Kentucky Transportation Cabinet District 3:

Kentucky Transportation Cabinet District 3 Traffic Impact Report for Oct. 18 Through Oct. 23
The District 3 area serves Allen, Barren, Butler, Edmonson, Logan, Metcalfe, Monroe, Simpson, Todd, and Warren Counties
BOWLING GREEN, Ky. (Oct. 18, 2026) – The expected traffic impacts in the Kentucky Transportation Cabinet District 3 area for Oct. 18 through Oct. 23 are listed below. All work is subject to change.

[Read Full Text]

[KY 884]

KY 884 (Three Springs Road) Widening Begins

Posted: 3-Oct-2026 3:56PM CDT

Construction started in mid-July to widen KY 884 (Three Springs Road) in Bowling Green from McCoy Place to Fieldstone Boulevard to three lanes, with a center turn lane, a single-lane roundabout at Smallhouse Road, sidewalks on both sides, a new bridge over I-165, and a turn lane for Foundation Christian Academy. District 3 Engineer Joe Plunk said growth in the area "has simply outpaced the current transportation infrastructure." The existing I-165 bridge will stay open until traffic shifts to the new one.

[Read Full Text]

[Commonwealth of Kentucky]

Speed limit reduction set for Three Springs Road in Warren County

Posted: 29-Aug-2010 8:15AM CDT
Topics: [KY 884] [Warren County]

From the Kentucky Transportation Cabinet Department of Highways District 3 (July 27, 2010):

BOWLING GREEN, Ky. – The Department of Highways District 3 Office advises motorists to be aware of a speed limit reduction on Three Springs Road (KY 884) in Warren County.
The speed limit will be reduced from 55 mph to 45 mph from the Minit Mart to 500 feet past the Long Road/Neal Howell Road intersection. At that point it will change to 55 mph.
Variable message boards will be posted in the area alerting motorists of this change that will go into effect on Friday.
[William H. Natcher Parkway]

Lane closure on the Natcher beginning tomorrow morning

Posted: 28-Aug-2010 7:31PM CDT

From the Kentucky Transportation Cabinet Department of Highways District 3 (Aug. 25, 2010):

BOWLING GREEN, Ky. – The Department of Highways District 3 Office advises motorists to be aware of a permanent lane closure for the right hand lane of southbound Natcher Parkway beginning tomorrow morning at 7 a.m.

[Read Full Text]

[William H. Natcher Parkway]

Study recommends no Natcher Parkway interchange be built at Elrod Road in Bowling Green

Posted: 7-Oct-2009 9:06PM CDT

A Kentucky Transportation Cabinet planning study recommends that no interchange be built between Elrod Road and Natcher Parkway near the parkway's terminus at I-65. The study was undertaken after a previous study found the construction of an interchange between the parkway and KY 884-Three Springs Road to be infeasible.

[Read Full Text]

[KY 884]

KYTC Plans Open House to Discuss Improvements to KY 884

Posted: 11-Oct-2001 7:22PM CDT

The Daily News of Bowling Green reports in this Oct. 10, 2001 article [Outside Link] that the KYTC is planning a day long open house to share information about planned improvements to KY 884 between US 231 and that Natcher Parkway in Warren County.

Update: The Daily News has a second article about the open house here [Outside Link].

[KY 884]

State to Study Improvements to KY 884

Posted: 2-Aug-2001 3:31AM CDT

The Bowling Green Daily News reports in this July 27, 2001 article [Outside Link] that the Kentucky Transportation Cabinet has begun studying possible improvements to KY 884 between US 231 and the Natcher Parkway in Bowling Green. Information on the planning study can be found here [Outside Link] on the KYTC website.

Updated: 19-Oct-2026 8:58PM CDT